If you own in a Maryland homeowners association or condominium, assume that exterior painting needs written approval before any work begins, then confirm it in your own governing documents. For condominiums, state law says a unit owner may not change the exterior appearance of a unit without permission of the council of unit owners. For HOAs, your declaration, bylaws and architectural guidelines set the process. Read those first, submit a complete request, allow time for review, and keep the approval in writing before the painters arrive.
This guide is a planning checklist, not legal advice. Every association is different, and your own documents control. If you are unsure what they require, ask your management company or board, or speak with a Maryland attorney.
Key Takeaways
- Start with your governing documents, not a paint chip. Your declaration, bylaws, rules and architectural guidelines decide what needs approval.
- For Maryland condominiums, Real Property § 11-115 says unit owners may not change the exterior appearance of a unit without the council of unit owners’ permission.
- A complete request moves faster. Include exact color names and codes, finish, locations, samples and photos.
- Ask about timing before you book a painter. Review schedules, meeting dates and resubmission steps vary.
- Get the approval in writing and give your contractor a copy.
Do you need approval before painting in a Maryland HOA or condo?
Often yes, especially for anything visible from outside, but the answer comes from your documents, not from a general rule. Interior painting inside your own unit is commonly less restricted. Exterior doors, trim, siding, railings, balconies, garage doors and shared hallways are more often covered by review.
For condominiums, Maryland’s condominium law is direct. Under § 11-115 of the Maryland Condominium Act, an owner “may not alter, make additions to, or change the appearance of the common elements, or the exterior appearance of a unit or any other portion of the condominium, without permission of the council of unit owners.” Your condo documents then spell out who reviews requests and how.
For HOAs, the Maryland Homeowners Association Act (Title 11B of the Real Property Article) sets general ground rules for associations, while the community’s own recorded documents usually set the architectural standards. The Maryland Department of Housing and Community Development keeps a page of common ownership community resources, and the Maryland Attorney General’s Consumer Protection Division publishes an overview of common ownership communities that notes architectural guidelines are a common source of owner questions. Those are good places to orient yourself, but they do not replace reading your own paperwork.
What should you read in your governing documents first?
Read the documents in a set order so you know what is regulated before you spend money on samples. Most associations have some version of the following.
- Declaration or master deed. The foundational document. Look for sections on exterior maintenance, alterations and what counts as a common element versus part of your unit.
- Bylaws. Often explain who sits on the board or review committee and how decisions are made.
- Rules and regulations. May list approved colors, finishes, or restricted items such as door colors.
- Architectural guidelines or design standards. The most useful document for painting. These often include approved palettes, sheen limits and submission requirements.
- Application form. If the association has one, use it. A request that does not follow the form can be sent back.
If you cannot find a palette or standard anywhere, do not guess. Email the manager or board and ask what is required for a repaint in the existing color versus a color change. Some communities treat those differently.
How does color and finish approval usually work?
Color and finish approval usually works one of three ways, and you can only know which applies by checking your documents.
- Approved palette. The association publishes a list of colors. You choose from it.
- Same-color repaint. Repainting in the existing color may require a lighter review or a notice, but this varies, so confirm before assuming.
- Case-by-case review. A board or committee reviews each request, often with samples.
Finish matters as much as color. Sheen can change how a color reads on siding, trim and doors, and some guidelines specify it. When you submit, name the product, color name and code, and finish for each surface: body, trim, front door, shutters and railings. If you want help narrowing color options first, our article on interior and exterior color trends for Maryland homes is a starting point, though your palette limits come first.
What should an approval package include?
A complete package prevents the most common delay: a request returned for missing information. Build the package before you submit, and keep a copy of everything.
| Item to include | Why it helps | Who usually supplies it |
|---|---|---|
| Completed association form | Shows you followed the stated process | Homeowner |
| Color names and codes for each surface | Removes guesswork on exactly what will be applied | Homeowner or contractor |
| Sheen or finish for each surface | Some guidelines restrict gloss levels | Homeowner or contractor |
| Physical or printed color samples | Reviewers often want to see the color | Homeowner |
| Photos of the current condition | Documents the starting point and any repairs | Homeowner |
| Scope description | Explains what is being painted and what is not | Contractor |
| Contractor name, license and insurance details | Many associations ask for these | Contractor |
| Proposed start and finish dates | Helps with scheduling and any common-area impact | Contractor |
How much time should you build in for approval?
Plan on more time than you think you need, and do not set a firm painter start date until approval is in hand. Review timelines are set by each association. Some committees meet monthly, some review as requests arrive, and a request that comes back for changes starts the clock again.
Practical ways to protect your schedule:
- Ask the manager how often the review committee meets and what the typical turnaround is.
- Ask what happens if the request is incomplete, and how resubmission works.
- Ask whether the approval expires if work does not begin by a certain date.
- For exterior work, tell your contractor up front that the start date depends on approval and weather. Our guide to the best time of year to paint a Maryland exterior explains why exterior timing already needs flexibility.
What contractor requirements should you expect?
Expect the association to care about who is working on its property. Requirements differ, but common requests include proof of license and insurance, a scope of work, a schedule, and rules about parking, noise, working hours and protecting shared areas.
Perfect Painters & More is licensed in Maryland (MHIC #76590) and provides free in-home estimates with a written proposal, which gives you a clear scope to attach to your request. Ask any contractor, including us, to confirm the documents your association will need before you submit.
For older buildings, ask about lead-safe practices. Homes and buildings built before 1978 can contain lead-based paint, and contractors working in them are subject to the EPA’s Renovation, Repair and Painting Program. Confirm the contractor’s approach before any scraping or sanding, and do not attempt lead-paint removal yourself.
How do you keep communication clear?
Clear communication means one written trail that everyone can point to. Keep it simple.
- Send your request in writing and keep the confirmation of receipt.
- If the association asks for changes, answer in writing and note what changed.
- Save the final approval, including any conditions, as a PDF.
- Give your painter a copy before work begins, so the colors and areas match what was approved.
- Tell neighbors or the manager about the work window if the work touches shared areas.
If your painter finds something unexpected, such as damaged trim or rot, check whether the repair changes the scope you were approved for. A quick written note to the manager is easier than explaining it afterward.
A quick pre-submission checklist
Before you send your request, confirm:
- You have read the declaration or master deed, rules and architectural guidelines.
- You know whether your project is a same-color repaint or a color change.
- Every surface has a color name and code and a finish.
- You have samples and photos ready.
- You know the review schedule and what happens if the request is incomplete.
- Your contractor has the documents the association asked for.
- You have decided not to schedule work until written approval arrives.
Planning an HOA or condo painting project?
We can help you put together a clear scope, a written proposal and a realistic schedule to attach to your request. Request a free estimate or call (410) 657-2468. You can also look at our residential painting services and exterior painting services, or contact us with questions before you submit.



